Gravel & aggregate planner
Plan your gravel quantity before you order
Estimate cubic yards, cubic meters, US short tons, and metric tonnes for a rectangular or circular area. Use your supplier’s loose bulk density and price to turn a volume takeoff into a material estimate.
1. Measure the area
Units convert automatically when changed. The area count applies only to identical dimensions.
Multiplier = loose supply volume ÷ finished compacted volume. Ask the supplier; there is no default factor for every gravel.
2. Confirm density & allowance
1.4 US tons/yd³ and 10% extra are editable examples. Density converts automatically when its unit changes. Use your supplier’s value for the product and moisture condition.
Optional supplier price
Enable JavaScript to use the calculator.
3. Your material estimate
—
Cubic yards including allowance
Your estimate will appear here.
Weight depends on the entered density.
Planning estimate. Confirm material specification, loose density, compaction conversion, supplier order increments, and delivery charges before ordering.
How much gravel do I need?
For a rectangle, multiply length by width by layer depth. For a circle, multiply π by the radius squared, then by depth. Keep measurements in the same unit. If you measured the finished compacted layer, convert that installed volume to loose supply volume using a material-specific multiplier before applying a separate extra allowance.
- Measure the layer itself. For a rectangular driveway or path, enter length and width; for a circular bed, enter the full diameter.
- Enter the planned depth. Specify whether it is loose or finished compacted depth. Depth examples on this page are arithmetic examples, not pavement or foundation designs.
- Confirm the supplier’s loose bulk density. Volume alone does not determine weight. Gravel type, grading, moisture, and the material’s condition affect the conversion.
- Check price units. A quote per US short ton is different from a quote per metric tonne or cubic yard.
Gravel formulas: volume, weight, and cost
Rectangle volume (ft³) = length (ft) × width (ft) × depth (in) ÷ 12
Volume (yd³) = cubic feet ÷ 27
Adjusted loose volume = measured volume × loose-volume multiplier × (1 + extra percentage ÷ 100)
US short tons = adjusted loose volume (yd³) × loose bulk density (US short tons/yd³)
Material cost = adjusted volume or weight × price per matching unit
One cubic yard equals 27 cubic feet. One US short ton equals 2,000 lb, or 907.18474 kg. One metric tonne equals 1,000 kg. The calculator retains unrounded values for weight and price calculations.
Worked example: a 20 ft × 10 ft gravel area
For a 4 in loose layer, the measured volume is 20 × 10 × (4 ÷ 12) = 66.67 ft³, or 2.4691 yd³. Adding an example 10% allowance gives 73.33 ft³, or 2.7160 yd³.
- Estimated weight: 2.7160 yd³ × an assumed 1.4 US short tons/yd³ = 3.8025 US short tons.
- Illustrative material price: at $50 per US short ton, 3.8025 × $50 = $190.12. This is an example, not a current market quote.
- Compaction conversion: none in this example because the entered depth describes a loose layer. A finished compacted depth needs its own supplier-supported loose-volume multiplier.
How much area does a yard or ton of gravel cover?
Coverage decreases as layer depth increases. The table assumes loose material, no extra allowance, and a density of 1.4 US short tons per cubic yard for the weight-based column.
| Layer depth | Per 1 yd³ | Per 1 US short ton |
|---|---|---|
| 2 in | 162 ft² | 115.7 ft² |
| 3 in | 108 ft² | 77.1 ft² |
| 4 in | 81 ft² | 57.9 ft² |
| 6 in | 54 ft² | 38.6 ft² |
Coverage formula: area (ft²) = volume (yd³) × 27 ÷ depth (ft). To convert one US short ton to volume first, divide 1 by your density in US short tons per cubic yard.
Density and compaction are different inputs
Density converts volume to weight. A value such as 1.4 US tons/yd³ is a bulk-density conversion. It does not say how much the gravel will settle or compact.
A loose-volume multiplier converts installed compacted volume to loose supply volume. For illustration only, a supplier-confirmed multiplier of 1.20 means 10 yd³ of finished material corresponds to 12 yd³ loose before any separate extra allowance. It is not a general recommendation for every gravel.
If a supplier describes a reduction percentage instead, confirm the meaning. A 20% reduction from loose to compacted volume corresponds to a multiplier of 1 ÷ 0.80 = 1.25, not 1.20. Avoid adding a second compaction allowance if it is already included in the supplier’s factor or quantity quote.
Before ordering gravel
- Confirm the material specification for the job. A volume calculator does not establish which aggregate or layer thickness your project requires.
- Measure uneven areas in smaller sections and add their quantities. The matching-area count is for identical shapes and dimensions.
- Calculate base and surface layers separately when they use different depths, materials, densities, or prices.
- Verify loose bulk density and any compacted-to-loose conversion with the supplier for the actual product.
- Ask about minimum orders, delivery access, truck-load limits, taxes, delivery fees, spreading, and compaction costs. These are not included in the material estimate.
Gravel calculator questions
How many tons are in a cubic yard of gravel?
It depends on the bulk density and the kind of ton. At an assumed 1.4 US short tons/yd³, one cubic yard weighs 1.4 US short tons. Use the supplier conversion for your gravel rather than treating this example as a fixed value.
Can I use this for pea gravel, crushed stone, or crusher run?
The volume arithmetic is the same, but bulk density, grading, and compaction behavior can differ. Enter the product-specific loose bulk density and use a supplier-supported multiplier if converting a compacted layer to loose supply volume.
How deep should gravel be for a driveway or foundation base?
The required depth depends on the material, ground conditions, drainage, loading, and project specification. Enter the specified layer thickness. This tool estimates quantities from a selected depth; it does not design a driveway, pavement, or structural foundation.
Does extra allowance automatically include compaction?
No. Extra allowance is a separate percentage. If your entered depth is compacted, select the compacted-layer option and enter the supplier loose-volume multiplier. The tool then applies the separate extra allowance once.
Can I calculate a circular gravel bed?
Yes. Choose Circle, enter the full diameter and layer depth, and choose the correct loose or compacted basis. The tool uses π × (diameter ÷ 2)² to calculate the area.
Does the cost include delivery and installation?
No. It multiplies the adjusted material volume or weight by the entered price in the chosen unit. Delivery, tax, spreading, excavation, grading, and compaction charges can be separate.
Why is the supplier scale ticket different from the estimate?
This tool estimates weight from geometry and a density assumption. Actual moisture, grading, measurement variation, loading, and supplier rounding can change the delivered weight. A scale ticket records actual weighed material.
Plan the next construction layer
For a concrete pour above a specified base, use the Concrete Calculator. Estimate footing, wall, and slab concrete separately with the Foundation Calculator. For masonry quantities, use the CMU Block Calculator.