Concrete quantity planner
How much concrete do you need?
Measure your slab, footing, or round column to estimate cubic yards, cubic meters, and concrete bags. Add your own allowance and supplier price to plan the order.
1. Enter your dimensions
10% is an editable example, not a requirement.
Optional settings: bags, price & weight
Use the yield and density for your product when available. Bag weight alone does not determine its exact yield.
Enable JavaScript to use the calculator.
2. Your concrete estimate
—
Cubic yards including allowance
Your results will appear here.
Enter actual measurements, then calculate your estimate.
Planning estimate only. This tool calculates quantity; it does not select structural thickness, reinforcement, or concrete strength.
How to use this concrete calculator
- Select the shape. Use rectangular mode for slabs, pads, and rectangular footings. Use round mode for a solid cylindrical column or hole.
- Enter the dimensions and units. For a slab, enter the concrete thickness above the prepared base. For a round pour, enter the full diameter, not the radius.
- Set the section count. Multiply only identical sections. Calculate sections with different dimensions separately and add their volumes.
- Choose your allowance. Enter 0% for the measured volume alone. Adjust the extra volume for site conditions and supplier guidance.
- Review the estimate. Ready-mix quantities include the allowance. Bag counts also include it and are rounded up to whole bags.
Concrete volume formulas
Rectangular slab or footing
Volume = length × width × depth
With length and width in feet and thickness in inches: yd³ = length × width × thickness ÷ 324.
Round column or hole
Volume = π × (diameter ÷ 2)² × depth
Use the same unit for diameter and depth. This estimates a solid cylinder; a post or other object inside the hole displaces some concrete.
One cubic yard equals 27 cubic feet. One cubic meter is approximately 35.315 cubic feet. The tool converts each input to a common unit before calculating.
Slab quantity reference table
These are volume examples, not recommended slab designs. Values are rounded for display; the calculator uses unrounded values internally.
| Slab dimensions | Thickness | Base volume | With 10% extra |
|---|---|---|---|
| 10 ft × 10 ft | 4 in | 1.23 yd³ | 1.36 yd³ |
| 12 ft × 12 ft | 4 in | 1.78 yd³ | 1.96 yd³ |
| 20 ft × 10 ft | 4 in | 2.47 yd³ | 2.72 yd³ |
| 20 ft × 20 ft | 4 in | 4.94 yd³ | 5.43 yd³ |
| 20 ft × 20 ft | 6 in | 7.41 yd³ | 8.15 yd³ |
Worked example: volume, bags, and material cost
For a 20 ft × 10 ft slab at 4 in thick, the base volume is 20 × 10 × (4 ÷ 12) = 66.67 ft³, or 2.4691 yd³. Adding 10% gives 73.33 ft³, or 2.7160 yd³.
- Ready-mix estimate: about 2.72 yd³ including the example allowance. Confirm the supplier’s order increments before ordering.
- Bag estimate: at a yield of 0.60 ft³ per bag, 73.33 ÷ 0.60 = 122.22, rounded up to 123 bags.
- Material-cost example: if your quote were $150 per yd³, 2.7160 × $150 = $407.41. This is an illustration, not a current market price.
Avoid these concrete estimating mistakes
- Mixing inches with feet: a 4-inch slab is 0.3333 feet thick. Entering 4 feet produces twelve times the volume.
- Using nominal dimensions: measure the actual formed area and depth. Uneven excavation can increase the quantity.
- Counting overlapping footings twice: break the layout into sections that do not overlap before adding volumes.
- Applying extra allowance twice: the calculator already includes your chosen percentage in its total volume and bag count.
- Treating material cost as a full project quote: delivery, pumping, short-load fees, tax, labor, reinforcement, formwork, and base preparation can be separate.
Concrete calculator questions
How much area does one cubic yard cover?
Coverage depends on thickness. One cubic yard covers 81 ft² at 4 inches thick, 54 ft² at 6 inches, or 40.5 ft² at 8 inches, before any extra allowance. Divide 27 ft³ by thickness in feet to calculate the area.
How many 80 lb bags make one cubic yard?
At an assumed yield of 0.60 ft³ per bag, one cubic yard takes 27 ÷ 0.60 = 45 bags before allowance. Check your product’s stated yield; products with the same bag weight can have different yields.
Should I use bags or ready-mix concrete?
Compare the total bag count, mixing equipment, available labor, placement schedule, and supplier delivery conditions. For the example above, 123 bags would require substantial handling and mixing. Ask for delivered ready-mix and bagged-material quotes for your actual project.
Does the calculator include gravel, reinforcement, or cement bags?
It calculates concrete volume and bags of complete concrete mix using the entered yield. It does not estimate a gravel base, rebar, or separate cement, sand, and aggregate quantities.
Can I calculate a footing around a building?
Use rectangular mode for each non-overlapping footing section, using its length, width, and depth. Add the section totals. The identical-section count works only when all three dimensions match.
Can I use this to calculate hollow CMU grout?
A block wall contains concrete shells, webs, and hollow cells, so its outside dimensions do not represent grout volume. Use the block manufacturer’s cell-fill data and the specified grouting layout for that estimate.
Continue planning your materials
For masonry work, use the CMU Block Calculator to estimate block quantities, the Brick Calculator for brickwork, or the Mortar Calculator for joint mortar.